Buoy Maintenance at Oban Airport

The week Cameron and Struan had a charter to check and maintain the Buoys off Oban Airport which marks the start of the Runway. The team used the 3.5 metre dinghy which allowed them to access the shackles and chains with ease. After a few fly overs the team loaded the dinghy onto Power of Scotland and headed back to base.

The crew also saw the first snow on Ben Cruachan. There is a definite feeling of a cold winter coming.

Previous
Previous

Next
Next