Coastal Connection had their landing craft chartered out on a job in the Sound of Islay. The main task was the new electricity cable between Islay and Jura being laid. During the 7 weeks she was based in Port Askaig she was transferring the workforce down to the remote locations. The shallow draft really helped access very tight spots. The prep work and the tidy up after the cable was in. They also helped with a big beach clean too. It has been great teaming up with SSE, Briggs and Venture West.