The team had a short notice call to run Cargo to a ship working in the area. They met a delivery man in Oban and loaded up the goods then headed out. The ship was carrying out operations to do with a new subsea power cable. A very impressive sight to see up close. Struan held the boat in position while the cargo was craned off. Nice calm day for it.