Tidal Connection

On Saturday the team helped with the installion of PLAT-I in Connel Sound. They ran lines to the device to allow the mooring chains to be winched in and secured by Green Marine UK. It was a privilege to work on this project with Green Marine and Sustainable Marine Energy Ltd. We look forward to seeing how the testing progresses in Connel before the device is disassembled and shipped to the Philippines.

IMG_4213.JPG
Previous
Previous

Merry Christmas

Next
Next

Tidal Lift